Nova Restauração
Please wait...

Technical sheet

Typology Architectural Heritage
Protection Monumento Nacional (1907) | UNESCO World Heritage (1983)
Period 16th-17th centuries (1513-1601)
Author(s) Diogo de Boitaca, João de Castilho, Nicolau de Chanterene, Jerónimo de Ruão
Date 2015 - 2016
Service Conservation-restoration
Work Plan for the conservation-restoration of the Church’s vaults – phase E1 Conservation condition survey; photographic and graphic survey of mason’s marks and architectural inscriptions / historical graffiti; conservation-restoration; hydraulic/drainage inspection and correction works; inspection of part of the roof; rehabilitation of the electric bird proofing; lightning rod.
Areas Bell tower and walls; West façade; galilee; main (axial) portal
Materials Stone (Lioz limestone); Painting (mural painting); Metals (metal alloys); Others (stained glass?)
Analyses Mortar sampling at the bell tower for subsequent analyses by the client.

Jerónimos Monastery Lisbon, Portugal

Multimedia